{"id":26873,"date":"2024-06-12T11:15:41","date_gmt":"2024-06-12T15:15:41","guid":{"rendered":"https:\/\/provost.ncsu.edu\/?p=26873"},"modified":"2024-06-12T11:38:49","modified_gmt":"2024-06-12T15:38:49","slug":"ceremony-showcases-integrative-sciences-buildings-progress","status":"publish","type":"post","link":"https:\/\/provost.ncsu.edu\/news\/2024\/06\/ceremony-showcases-integrative-sciences-buildings-progress\/","title":{"rendered":"Ceremony Showcases Integrative Sciences Building\u2019s Progress"},"content":{"rendered":"\n\n\n\n\n

A crowd of onlookers cheered the placing of the steel beam completing the bones of NC State\u2019s Integrative Sciences Building<\/a> during a topping out ceremony on May 22.<\/p>\n\n\n\n

\u201cTopping out\u201d \u2014 a tradition dating back to 700 A.D. \u2014 marks the completion of the structural frame of a new building, during which the uppermost steel beam is set in place. An evergreen tree is often placed on top of the beam, representing good luck for the duration of the project. At this ceremony, the tree, flanked by American and NC State flags, rose to its new home atop the ISB with help from a large crane and Kenny Loggins\u2019 \u201cDanger Zone\u201d playing in the background.<\/p>\n\n\n\n